Suggestions
View all results

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2019 Upstream major projects
  5. Angelin, Trinidad

Angelin, Trinidad

completed: 26 february 2019

~60 mboed peak annual average production, net to BP
The Angelin project develops four wells and features the construction of a new platform 40 miles off the southeast coast of Trinidad in water-depth of approximately 215 feet. Gas from Angelin flows to the Serrette platform hub via a new 13-mile pipeline.
Location Trinidad
Operator BP
Partners 100% owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG
Peak annual average production
~60 mboed (gross)
~60 mboed (net)
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
Angelin
红包扫雷棋牌游戏下载大全 红包扫雷群怎么加人快又多 红包扫雷斗地主 红包扫雷群公告福利 抢红包扫雷牛牛二维码